An existing 100m³ tank was recalculated, refurbished and new pressure relieve valves were installed.
New jacketed transfer lines needed to be foreseen. The existing pipe racks were recalculated according to the new loads and modified accordingly.
Parts of the existing instrumentation was renewed .
new pumps and modifications on the existing pumps were part of the scope.
A tempered heated warm water system to feed the tank and piping jackets was engineerd and built.
Year:
2011