new production building with vessels and reactors

A complete new 3 floor concrete production building needed to be designed 

Five new stirred stainless steel pressure reactors were needed in this concept

Some intermediate product tanks were installed, connected to the reactors

Piping from tanks and reactors to the nearby tankfarm was needed

A deep vacum system along with condensors, and possibilities for adding solids were part of the scope

Debottlenecking and upgrading of the site utilities 

 

 

 

Year: 
2019